Technological Innovation

What are the 5 levels of BIM ?

Building Information Modeling (BIM) is a critical tool for architects, engineers, and construction professionals. It allows them to create digital representations of a building's physical and functional characteristics. However, BIM is not just a one-time task, it is an ongoing process that requires careful planning, organization, and collaboration to achieve the desired outcomes.

BIM has evolved over the years from a simple 2D system to a complex 3D system that incorporates all aspects of the building project. There are five different levels of BIM, each representing an increased level of integration and collaboration.

Level 0: Unmanaged CAD

The first level of BIM is the Unmanaged CAD level. This is the simplest form of BIM where users create individual 2D plans and sections and collaborate through manual methods. This level is primarily used for basic design and planning purposes.

Level 1: Track-based BIM

The second level of BIM is Track-based BIM. This level involves the use of project tracking systems to keep track of the different elements of the building project. Users can create and manage project schedules, track changes, and collaborate with other team members.

Level 2: Collaborative BIM

The third level of BIM is Collaborative BIM. This level allows users to collaborate with other team members in real-time, share project information, and track changes in real-time. This level is critical for complex projects where multiple stakeholders need to collaborate.

Level 3: Project management BIM

The fourth level of BIM is Project management BIM. This level involves the use of project management software to manage projects from start to finish. Users can create and manage project plans, track project budgets and deadlines, and collaborate with other team members.

Level 5: Building information management BIM

The fifth level of BIM is Building Information Management BIM. This level involves the use of a centralized database to manage all aspects of the building project, including design, construction, and maintenance. Users can access and update project information in real-time, track changes, and collaborate with other team members.

In conclusion, the five levels of BIM have different levels of complexity and integration, each representing a step in the process of creating and managing digital representations of a building. By understanding these levels and their significance, professionals can choose the right level of BIM for their project and achieve their desired outcomes.

CONTACT US

Contact: Cindy

Phone: +86-13751010017

E-mail: sales@iecgauges.com

Add: 1F Junfeng Building, Gongle, Xixiang, Baoan District, Shenzhen, Guangdong, China

Scan the qr codeclose
the qr code
TAGS Test Probe BTest Probe 18Test Probe 11Go GaugesIEC 61032IEC 60335Test PinTest FingerIEC 60061-3Wedge Probe7006-29L-47006-27D-37006-11-87006-51-27006-51A-2 7006-50-17006-27C-17006-28A-1Test Probe7006-27B-1IEC 61010IEC 60529IEC 60068-2-75